In short:
- A disaster recovery plan (DRP) describes the technical resources and procedures needed to restore a company’s IT system after a major incident.
- It sets, for each critical system, an RTO (maximum recovery delay) and an RPO (maximum acceptable data loss), which shape the choice of recovery infrastructure.
- Building it follows a structured approach: auditing the IT system, choosing a backup strategy, writing the plan, then testing and updating it regularly.
- The DRP is the technical component of the business continuity plan (BCP), which covers the whole organisation, both people and systems.
An IT disaster recovery plan organises how a company brings its IT system back online after an event that takes it down: a severe hardware failure, a cyberattack, a fire, a flood or a prolonged outage at a hosting provider. Instead of improvising a recovery under pressure, the company works from a document that states which systems to restore first, on which recovery infrastructure, and within which timeframe. This article covers what a DRP includes, the RTO and RPO indicators that structure it, the steps to build one, and how it differs from a business continuity plan.
What is an IT disaster recovery plan?
A disaster recovery plan, or DRP, records the technical procedures and the hardware resources a company mobilises to restore its IT system after an incident that has taken it offline. It answers a specific question: if a server, a critical application or a hosting site becomes unusable, how and within what timeframe does the IT system become operational again.
A DRP covers three technical layers: infrastructure (servers, network, storage), applications (business tools, email, management software) and data (databases, files, backups). It differs from a simple backup procedure in its scope: a backup protects data, while a DRP organises the full rebuild of an operational system from that data, with defined roles, failover procedures and preset timeframes. This technical layer sits within a broader Enterprise Service Management approach, where the availability of services delivered to the business depends directly on the IT system’s ability to absorb a disaster.
Why set up an IT disaster recovery plan?
Formalising a DRP addresses several needs that overlap in practice.
The first is limiting the financial impact of an outage: every hour a critical system is unavailable has a direct cost, in lost activity or contractual penalties, and an indirect cost on customer trust. The second is controlling the risk of data loss: without a backup and recovery strategy set in advance, an incident can wipe out data that no recovery procedure can rebuild. The third, regulatory in some sectors, concerns financial institutions, healthcare operators and operators of vital importance: recent European frameworks, such as the NIS 2 directive on cybersecurity or the DORA regulation for the financial sector, strengthen IT resilience requirements and mandate regular testing of recovery arrangements.
Prioritising this IT risk falls, in practice, to IT governance, which arbitrates how much investment goes into disaster recovery against the organisation’s other technical priorities. A poorly controlled IT footprint, of the kind exposed by shadow IT, complicates this arbitration: tools adopted outside the managed perimeter often escape the backup and recovery procedures a DRP is meant to cover.
RTO and RPO: the key indicators of a DRP
An effective DRP does not aim for the same level of readiness across all systems: it calibrates the recovery effort to the actual criticality of each one. This calibration rests on two indicators, set system by system during the risk assessment.
RTO (Recovery Time Objective, or maximum acceptable downtime) is the maximum time a system can stay down before the consequences become unacceptable for the business. An online payment system typically calls for an RTO of minutes to a few hours, while an internal reporting tool can tolerate an RTO of several days.
RPO (Recovery Point Objective, or maximum acceptable data loss) is the amount of data, measured in time, a company can afford to lose between the last backup and the incident. An RPO of one hour requires at least hourly backups or replication; an RPO of one day leaves more room, at the cost of a potentially larger data loss in the event of an incident.
These two indicators directly shape technical choices: a short RTO and a short RPO call for a recovery infrastructure available almost instantly, through continuous replication, while broader objectives allow recovery from standard backups, which cost less to maintain. This logic of calibrating effort to criticality echoes governance frameworks like COBIT, which likewise recommend adjusting risk management effort to each system’s actual exposure, rather than applying the same treatment everywhere.
Steps to build an IT disaster recovery plan
Building a DRP follows a structured approach that starts from the existing technical setup and ends with a tested, documented plan.
1. Audit the IT system and its risks
This first step inventories the company’s systems, applications and data, then assesses their criticality for the business and the threats they face: hardware failure, cyberattack, in particular ransomware, a physical incident at a hosting site, or a cloud provider outage. The audit draws on technical teams, the only ones able to accurately assess how dependent each system really is on a given infrastructure.
2. Set recovery objectives and the backup strategy
For each critical system identified in the previous step, the company sets an RTO and an RPO, then chooses a technical strategy consistent with those objectives: a standby site running permanently, a recovery infrastructure activated on demand, continuous replication to a remote site or a cloud provider, or restoration from regular backups. The choice depends on the available budget and the cost of downtime for each system: a recovery infrastructure available instantly costs more to maintain than a delayed recovery from backups.
3. Write the plan and the failover procedures
The plan formalises, for each system, the failover procedure to the recovery infrastructure, the restoration priority order between systems, the people responsible for each action, and the means to verify that recovery has gone correctly. It also lists key technical contacts: operations team, hosting providers, vendors of critical applications.
4. Test and keep the DRP up to date
A DRP that is written but never tested carries a high risk of failing exactly when it is needed. Testing under real conditions is as much a part of the process as writing the plan, and it repeats at regular intervals.
Testing and maintaining a DRP under operational conditions
Testing a DRP takes several forms, to be combined based on the criticality of the systems covered. A tabletop test walks through the procedure with the teams involved, without mobilising the real infrastructure, to check the plan’s consistency and the clarity of each role. A technical failover test verifies the actual ability to run a system on its recovery infrastructure, measuring the real delay achieved against the targeted RTO. A full-scale exercise simulates a real outage of a system for a limited period, to validate the entire chain, from detecting the incident to returning to normal operation.
Most frameworks recommend testing a DRP at least once a year, and reviewing it after any significant change: a new critical application, an infrastructure migration, a change of hosting provider, or a notable shift in the threats identified during the last audit. Each exercise produces a report that lists the gaps between the plan and what was actually observed, so procedures and stated recovery times can be adjusted. A DRP that is never updated, while the infrastructure keeps evolving, quickly loses its reliability and can end up promising recovery times that no longer match the IT system’s real technical state.
DRP vs BCP: what is the difference?
A disaster recovery plan is often confused with a business continuity plan (BCP), even though the two cover different but complementary scopes. The DRP focuses specifically on the IT dimension: it defines how systems, applications and data return to an operational state after an incident, with its own objectives for delay (RTO) and data loss (RPO). The BCP covers a wider scope: it defines how the whole organisation, both people and systems, keeps running its essential activities during and after a crisis, whether that means relocating a team, communicating with customers, or running a service in degraded mode.
In practice, the DRP sits within the BCP as one of its components, the one that specifically addresses restoring the IT system. A BCP without a solid technical component stays vulnerable as soon as a crisis hits the IT systems, while a standalone DRP, without any thought given to broader business continuity, does not guarantee the company’s actual recovery: restoring a system while the teams that use it are not themselves able to resume work leaves the business at a standstill despite having a working infrastructure.
Frequently asked questions
What is an IT disaster recovery plan (DRP)?
A disaster recovery plan is a document that describes the procedures and technical resources needed to restore a company’s IT system after a major incident: a severe outage, a cyberattack, a fire or a natural disaster. It covers infrastructure, applications and data, with the goal of bringing critical systems back to an operational state within a defined timeframe.
What is the difference between a DRP and a BCP?
A disaster recovery plan (DRP) focuses on restoring IT systems and infrastructure after an incident. A business continuity plan (BCP) covers a wider scope: it defines how the whole organisation, both people and systems, keeps running its essential activities during and after a crisis. The DRP is usually one component of the broader BCP.
What are RTO and RPO in a DRP?
RTO (Recovery Time Objective) is the maximum time a system can stay down before the consequences become unacceptable for the business. RPO (Recovery Point Objective) is the maximum amount of data, measured in time, a company can afford to lose between the last backup and the incident. Both are set system by system and directly shape the choice of backup infrastructure.
How do you build an IT disaster recovery plan?
Building a DRP follows a structured approach: auditing the IT system and its risks, setting recovery objectives (RTO, RPO) for each critical system, choosing a backup strategy and a recovery infrastructure, writing the plan and the failover procedures, then testing the setup regularly.
How often should a DRP be tested?
Most frameworks recommend testing a DRP at least once a year, through a technical failover test or a full exercise, and reviewing it after any significant change to the infrastructure or the critical applications. A DRP that is never tested carries a high risk of failing exactly when it is needed, due to outdated procedures or an undersized recovery infrastructure.